

Azzur Cleanrooms on Demand™
Project Overview
The Angstrom Group successfully delivered the second of three facilities for Azzur Cleanrooms on Demand™, a 30,000 square foot clinical manufacturing cleanroom facility. The facility includes 30 independent cleanroom suites, each equipped with a Material Airlock (MAL), Personnel Airlock (PAL), Cleanroom, and Exit PAL. Shared entry and exit corridors ensure efficient access to and from each suite.
The project scope included full turnkey design/build services encompassing cleanroom construction, mechanical, electrical, low-voltage, flooring, and process gas systems. Additional facility features include a locker room and changing area, and GMP warehouse-connected MALs for transferring large equipment. All cleanroom suites are integrated with advanced monitoring and control systems connected to the building management system (BMS).
About Our Client
Azzur Cleanrooms on Demand™ (COD) offers a hybrid early-phase manufacturing model geared specifically to the challenges early-phase manufacturers face when it comes to starting up and scaling out. The need for clinical manufacturing capability and lengthy facility design-build timeframes are both barriers that COD can remove. This is the first COD facility Angstrom has delivered for the Azzur Group and the 4th in the Azzur COD group. Angstrom Technology is currently under construction on Azzur COD facilities in Devens, MA (32,000 SF) and Alameda, CA (30,000 SF).
- Location Devens, MA
- Size 30,000 SF
- Classification ISO 7, ISO 8, CNC
- Scope Turnkey Design-Build
- System Puracore
- Critical Conditions Temperature, Humidity, Structural Considerations, Specialist Lab Gases